When the ordinary heat treatment resistance furnace is built as a whole, a groove for inserting bricks should be left at the size of the high-alumina bricks of the original heating body of the brick-built furnace. The daily maintenance is mainly to replace the furnace wires, bricks and furnace wires.Vacuum hardened spring steel wire For salt bath furnace faults—salt leakage and electrode corrosion, the pouring method is used to solve the salt leakage of the furnace body; for the easy corrosion of the motor, the furnace body is poured into two bodies, that is, the electrode is poured into a stepped block separately. After the electrode is corroded, Only remove the electrode part to be replaced. Brick Furnace WayVacuum Heat Treatment Applications for Metal Machine Tools and Gear Parts (1) Take targeted repairs, pay attention to the back wall, side wall, furnace door arch, furnace vault, etc. of the larger brick furnace not to bite each other and crush each other, so that when the partial damage does not need to be rebuilt as a whole, the griddle can be rebuilt. Repair the above parts separately.Pay Attention to Vacuum Tempering to Improve the Quality of Quenched Parts For example, the arch foot of the furnace does not have to be supported on the side wall, but can be supported on the arch foot beam of the steel structure on both sides of the furnace, so that the furnace wall is not subject to the force of the vault, which is beneficial to both the furnace wall and the vault. However, considering the thermal expansion of the arch foot beam, it is necessary to leave a gap. When laying vault bricks, the arch feet on both sides are symmetrically built towards the center at the same time. The lock bricks of the vault shall not be cut, and the lock bricks shall be accurately distributed according to the center line of the vault.Analysis of vacuum heat treatment process for wind power products